The Grafton — Altadore
2,860 sq ft · 4 bed · 14-month build
Calgary, AB — inner-city & Springbank
Copperstone designs and builds fixed-price custom homes — infills, detached customs, and major renovations — across Calgary’s inner city and Springbank. Six to eight a year, on purpose.
01 — Selected builds
Four of the twenty-six homes we’ve delivered since 2019 — shown as front elevations, because that’s where every one of them started.
2,860 sq ft · 4 bed · 14-month build
2,540 sq ft · 3 bed · 13-month build
3,410 sq ft · 4 bed · 16-month build
3,980 sq ft · 5 bed · 18-month build
02 — How it runs
This is the schedule we actually run — and exactly when money changes hands at each stage.
Phase 01
3months
PaymentsA flat design retainer, credited in full against your build contract if we proceed together.
Phase 02
2months
PaymentsNothing. You don’t pay us to wait for the City.
Phase 03
12months
PaymentsFive draws, each released only after its inspection passes. We never bill ahead of work in place.
17 months, design to possession. Weather can move it — and when it does, you hear it from us first, with a revised date, in writing.
03 — Standards
Every builder says quality. These are the specifications we hold on every home, written down so you can hold us to them.
Argon-filled, low-e triple glazing is the base specification on every opening — not a line on an upgrade sheet.
Two-pound closed-cell spray foam at rim joists, cantilevers, and every ceiling that touches outdoor air.
Your site superintendent runs your build and nothing else, from excavation to possession. Six to eight homes a year is what makes that math work.
Fenced, swept, and locked every Friday afternoon. Neighbours get the super’s cell number before we break ground.
Blower-door tests at air-seal and again before possession. We target 1.5 air changes per hour — and you get both printouts.
Engineered joists, glued and screwed. We walk every floor before drywall goes on and chase down every squeak.
Weeping tile and damp-proofing are photographed and video-scoped before a shovel of backfill goes in. The footage is yours.
Room-by-room heat-loss calculations decide the mechanical equipment — not the square footage, not a rule of thumb.
04 — Before you buy the lot
The most expensive mistakes in custom building happen before a single drawing exists. Send us a listing and we’ll return a lot assessment within 48 hours — free, whether or not you build with us.
Winter solar angles, plotted for the actual elevations — which rooms get December light in Calgary, and which never will.
Which trunks the tree protection bylaw guards, and what the retention zones do to your buildable envelope before you draw a wall.
Slope, drainage, and utility rights-of-way — what the dirt adds to the foundation line, priced before you’ve written an offer.
Free means free. The assessment is yours to keep either way — we’d rather you buy the right lot than start a project on the wrong one.
Every draw matched a stage we could walk through and see finished. The number we signed in the design office was the number at possession — to the dollar.
05 — Start here
Ninety minutes — at our shop or on the lot you’re considering. Bring drawings, a listing, or a napkin sketch. You’ll leave with a realistic range for cost and schedule, and a straight answer on whether we’re the right builder for it.
Book a build consultationWe take on six to eight builds a year. Next available start: spring 2027.